Rajasthan Integrated Clean Energy Policy 2024 Explained: Targets, Storage, Green Hydrogen And Incentives
Rajasthan's Integrated Clean Energy Policy 2024 replaced its separate solar, wind and biomass policies. Targets, storage, hydrogen and incentives explained.
Rajasthan Integrated Clean Energy Policy 2024 Explained
๐ก Rajasthan Integrated Clean Energy Policy 2024: Key Highlights
- Rajasthan notified the Integrated Clean Energy Policy 2024 in December 2024, replacing separate solar, wind, biomass and green hydrogen policies with a single framework.
- The policy targets 125 GW of renewable energy capacity by 2029-30: 90 GW solar, 25 GW wind and hybrid, and 10 GW from hydro, pumped storage and battery storage.
- As of 30 September 2026, the state had 51,595 MW of installed renewable capacity, led by 45,121 MW of solar (rank 1 nationally).
- Incentives include 100% electricity duty exemption for seven years, 75% stamp duty exemption with 25% reimbursement, and 100% mandi fee reimbursement.
- The policy has been amended twice โ in mid-2025 and in August 2026 โ primarily to refine land allotment rules for large projects of 1,000 MW and above.
The Rajasthan Integrated Clean Energy Policy 2024 is the state’s current governing framework for renewable energy development. Notified by the Energy Department, Government of Rajasthan in December 2024, it replaced a patchwork of separate technology-specific policies with a single, consolidated document covering solar, wind, hybrid, biomass, waste-to-energy, green hydrogen and energy storage. The policy sets a target of 125 GW of renewable capacity by the financial year 2029-30 and will remain in force until 29 March 2029 or until superseded.
This post explains the policy’s scope, targets, storage and hydrogen provisions, the incentives it offers, the land allotment rules introduced by its two subsequent amendments, and where Rajasthan’s installed capacity stands against the target as of September 2026.
What The Rajasthan Integrated Clean Energy Policy 2024 Replaced
Before December 2024, Rajasthan governed its renewable energy sector through several separate policies:
- The Rajasthan Solar Energy Policy 2019, which had set a target of 30 GW of solar capacity by 2024-25 โ a milestone the state has since surpassed.
- The Rajasthan Wind and Hybrid Energy Policy 2019.
- Separate policies and frameworks for biomass, waste-to-energy and green hydrogen.
In 2023, the state consolidated the solar and wind policies into the Rajasthan Renewable Energy Policy 2023. The Integrated Clean Energy Policy 2024 goes further: it supersedes the 2023 policy and brings biomass, waste-to-energy, green hydrogen and energy storage under the same umbrella. Developers and investors now have a single reference document instead of hunting across multiple notifications.
For context, the draft of the 2019 solar policy was itself a significant step at the time. The 2024 policy represents the third generation of Rajasthan’s renewable energy governance in five years.
The 125 GW Target โ Solar, Wind, Storage And More
The Rajasthan Integrated Clean Energy Policy 2024 sets an aggregate target of 125 GW (1,25,000 MW) of renewable energy capacity by the financial year 2029-30. The breakdown, as stated in the policy:
| Technology | Target (MW) |
|---|---|
| Solar power | 90,000 |
| Wind and hybrid energy | 25,000 |
| Hydro, pumped storage plants (PSP) and battery energy storage systems (BESS) | 10,000 |
| Total | 1,25,000 |
Source: Rajasthan Integrated Clean Energy Policy 2024, Energy Department, Government of Rajasthan (target figures).
The scope of technologies explicitly covered by the policy includes:
- Large-scale solar parks and rooftop solar (with net metering, virtual net metering and group net metering)
- Decentralised solar power projects (0.5 MW to 5 MW near 33 kV substations)
- Wind farms and wind-solar hybrid projects
- Floating solar
- Biomass and waste-to-energy
- Battery energy storage systems (BESS)
- Pumped storage plants
- Green hydrogen and green ammonia
- Renewable-energy-powered EV charging infrastructure
Agricultural solarisation โ encouraging solar installations on farmland โ and renewable energy parks also feature prominently. The policy is designed to contribute to India’s national target of 500 GW of non-fossil energy capacity.
Green Hydrogen And Energy Storage Provisions
Green hydrogen
The policy integrates Rajasthan’s earlier Green Hydrogen Policy 2023 provisions into its consolidated framework. It envisages green hydrogen production hubs powered by the state’s solar and wind resources, targeting industrial applications in steel, refining and transportation โ sectors that are difficult to decarbonise through electrification alone.
The incentive options available for green hydrogen projects under the Rajasthan Investment Promotion Scheme (RIPS) 2024 include SGST reimbursement (capped at Rs 15 crore per year), a capital subsidy of 10โ20 per cent, or a turnover-based incentive of 1โ1.4 per cent. Developers choose one of the three; they are not cumulative. India’s broader National Green Hydrogen Mission provides the central policy context for these state-level provisions.
Energy storage
The 10 GW target for hydro, pumped storage and BESS is a distinctive feature of this policy. Beyond setting a capacity target, the Rajasthan Integrated Clean Energy Policy 2024 makes storage mandatory for certain projects:
- Grid-connected RE projects above 5 MW connected to the state transmission utility (STU) or DISCOM network must install a BESS with a minimum capacity of 5 per cent of the RE project’s capacity, with at least two hours of storage backup.
- Captive RE projects with capacity between 100 and 200 per cent of the contract demand must install a BESS capable of storing at least 20 per cent of the energy generated by the incremental capacity (the portion above 100 per cent of contract demand).
These requirements push developers to pair generation with storage from the outset, rather than treating storage as an afterthought. At the national level, the central government’s viability gap funding (VGF) scheme for 92 GWh of grid-scale storage complements these state provisions.
Incentives For Renewable Energy Developers
The incentives for renewable energy projects under the Rajasthan Integrated Clean Energy Policy 2024 are delivered primarily through the Rajasthan Investment Promotion Scheme (RIPS) 2024, the state’s overarching investment incentive framework. The key benefits for RE projects:
| Incentive | Benefit |
|---|---|
| Electricity duty | 100% exemption for 7 years |
| Stamp duty | 75% exemption + 25% reimbursement |
| Land conversion charges | 75% exemption + 25% reimbursement |
| Mandi / market fee | 100% reimbursement for 7 years |
| Pollution control board fees | Full waiver for establishing and operating projects |
| Banking, wheeling and transmission charges (captive consumption) | 100% waiver or reimbursement |
Source: RIPS 2024, Government of Rajasthan. Projects selling to entities other than DISCOMs may alternatively supply 7% of power generated free of cost as the RE Development Fund Contribution (REDFC).
Additionally, RE projects with battery storage receive 50 to 100 per cent exemption from registration charges, depending on storage capacity โ a further signal that the state wants generation paired with storage.
For biomass and waste-to-energy projects, the policy offers similar duty waivers plus land assistance at subsidised rates and a 36-month commissioning deadline.
Land Allotment, Security Deposits And The 2025โ2026 Amendments
Land is the practical constraint in Rajasthan’s renewable energy buildout, and the policy devotes considerable space to it. The Rajasthan Renewable Energy Corporation (RREC) is the nodal agency that recommends land allotment to the Revenue Department, following the Rajasthan Land Revenue (Allotment of Land for Setting Up of Power Plants Based on Renewable Energy Sources) Rules, 2007.
Original land provisions (December 2024)
- Security deposit: Rs 1 lakh per MW, payable by DD or RTGS in favour of RREC. Refundable proportionately upon commissioning; forfeited if the developer violates policy or land-revenue rules.
- Maximum land area: Up to 2.0 hectares per MW for solar and wind projects; up to 2.5 hectares per MW for wind-solar hybrid projects.
- Tree plantation: 10 per cent of allotted land must be reserved for tree plantation on all RE and green hydrogen projects.
First amendment (mid-2025)
The Energy Department added Clause 16.2.6, creating a new land “set-apart” route for developers of RE or green hydrogen projects with a minimum capacity of 1,000 MW โ specifically those who had signed MoUs at the Rising Rajasthan Global Investment Summit but did not yet have a power purchase agreement (PPA) or CTU/STU connectivity. The allotment timeline for these large projects: at least one-third of land within 3 years, two-thirds within 6 years and full allotment within 9 years, with the security deposit forfeited on non-compliance.
Second amendment (17 August 2026)
The August 2026 amendment broadened the land allotment provision beyond MoU signatories. It now permits allocation for any RE project, RE park, green hydrogen project or green hydrogen park with a minimum capacity of 1,000 MW, including projects without existing CTU/STU connectivity. The amendment also clarified that power evacuation facilities must be utilised within two years, failing which the approval is reallocated to other developers, and that stamp duty on lease or sub-lease deeds is borne by the developer.
Rajasthan’s DRE-PMT digital monitoring tool tracks distributed renewable energy projects across the state, providing a live dashboard of project commissioning progress.
Where Rajasthan Stands Today โ Installed Capacity Versus Target
As of 30 September 2026, Rajasthan’s installed renewable energy capacity stood at 51,595.50 MW โ roughly 41 per cent of the 125 GW target. The technology breakdown:
| Technology | Installed (MW) | Target (MW) |
|---|---|---|
| Solar | 45,121 | 90,000 |
| Wind | 5,815 | 25,000 (wind + hybrid combined) |
| Hydro, PSP, BESS | Not separately stated | 10,000 |
| Total RE | 51,596 | 1,25,000 |
Source: Rising Rajasthan, Government of Rajasthan (installed capacity as of 30 Sep 2026). Target figures from the Rajasthan Integrated Clean Energy Policy 2024.
Key markers from the same government source:
- Rajasthan ranks first nationally in solar installed capacity (45,121 MW as of 30 September 2026).
- Rajasthan ranks second nationally in total renewable energy installed capacity.
- In FY 2025-26, the state generated 69.12 billion units from renewable sources, ranking first nationally in RE generation โ a 20.5 per cent year-on-year increase from 57.35 billion units in the prior year.
- Renewable energy accounts for approximately 77.5 per cent of the state’s total installed power capacity.
To reach 125 GW by 2029-30, the state needs to add roughly 73 GW in less than four years โ about 18โ19 GW per year. For context, Rajasthan’s wind capacity has grown from 2,785 MW in March 2014 to 5,815 MW in September 2026 โ about 3,030 MW added over 12.5 years. The wind and hybrid target alone (25 GW) requires a step-change in pace. The solar side is further along but still needs to nearly double from its current base. The 10 GW storage and hydro target is building from a much smaller base and will depend heavily on central government VGF support and private investment in BESS manufacturing.
What This Means For The Energy Transition
The Rajasthan Integrated Clean Energy Policy 2024 is structurally different from the policies it replaced in three ways.
First, it treats clean energy as one system, not a collection of technologies. By putting solar, wind, storage, hydrogen and biomass into a single framework, it allows hybrid and storage-paired projects to access incentives under one application rather than navigating separate schemes. That matters because the grid increasingly needs firm, dispatchable renewable power, not just peak-hour solar.
Second, it makes storage a condition, not an option. The mandatory BESS requirement for RE projects above 5 MW and for over-sized captive projects is an early example of a state embedding storage into its generation policy rather than leaving it to central grid operators. If enforced, it will create a distributed storage base across Rajasthan’s RE fleet.
Third, it creates a land pathway for very large projects. The 1,000 MW threshold for the streamlined set-apart route, introduced by the amendments, is designed for the ultra-mega parks that will be needed to close the gap between 51 GW installed and 125 GW targeted. Whether that pathway delivers at the pace needed is an open question โ land allotment timelines of up to nine years sit uncomfortably alongside a target year of 2029-30.
The 125 GW target is ambitious relative to the current run rate. But Rajasthan has the solar resource โ over 325 clear sunny days a year โ the land, and now a consolidated policy framework. The constraint, as with most large-scale RE buildouts, is execution: land clearances, transmission infrastructure and the pace of storage deployment.
Frequently Asked Questions
When was the Rajasthan Integrated Clean Energy Policy 2024 notified?
The Energy Department, Government of Rajasthan notified the policy in December 2024. It has since been amended twice โ in mid-2025 and on 17 August 2026. The full policy document is hosted on the Rajasthan Government’s iStart portal.
What is Rajasthan’s renewable energy target under this policy?
The policy targets 125 GW of renewable energy capacity by FY 2029-30, comprising 90 GW solar, 25 GW wind and hybrid, and 10 GW from hydro, pumped storage and battery storage. The policy is valid until 29 March 2029 or until superseded.
Which previous policies did the Rajasthan Integrated Clean Energy Policy 2024 replace?
It supersedes the Rajasthan Renewable Energy Policy 2023, which had itself replaced the Rajasthan Solar Energy Policy 2019 and the Rajasthan Wind and Hybrid Energy Policy 2019. It also integrates the state’s separate biomass, waste-to-energy and green hydrogen policy frameworks into one consolidated document.
What is the current installed renewable energy capacity in Rajasthan?
As of 30 September 2026, Rajasthan’s installed renewable energy capacity was 51,595.50 MW, including 45,121 MW of solar and 5,815 MW of wind. The state ranks first in India in solar installed capacity. (Source: Rising Rajasthan, Government of Rajasthan.)
What incentives does the policy offer to renewable energy developers?
The main incentives, delivered through the Rajasthan Investment Promotion Scheme (RIPS) 2024, include 100% electricity duty exemption for seven years, 75% stamp duty exemption with 25% reimbursement, 100% mandi fee reimbursement for seven years, and full waiver of pollution control board fees. Captive RE projects also receive 100% waiver of banking, wheeling and transmission charges.
Researched and drafted with AI assistance; facts checked against the sources linked above and reviewed by the Yellow Haze team.
Sources: Rajasthan Integrated Clean Energy Policy 2024 โ Energy Department, Government of Rajasthan | Rising Rajasthan โ Renewable Energy, Government of Rajasthan (installed capacity as of 30 Sep 2026) | RIPS 2024 โ Department of Industries, Government of Rajasthan (incentives) | MNRE State-wise Installed Capacity, Ministry of New and Renewable Energy.